当前位置:首页>新闻中心>公司动态自上料搅拌车的运营效率是如何?

自上料搅拌车的运营效率是如何?

来源:http://www.jfhntjbj.com/ 日期:2021-03-29 发布人:admin
概述:自动上料搅拌车正确使用设备齐全的搅拌车可以促进施工并提高运营效率。正确使用机械零件会损坏设备并缩短其使用寿命。主要操作是严格按照说明进行操作。通常,如果夏季搅拌车太热,则
自动上料搅拌车正确使用设备齐全的搅拌车可以促进施工并提高运营效率。正确使用机械零件会损坏设备并缩短其使用寿命。主要操作是严格按照说明进行操作。通常,如果夏季搅拌车太热,则应立即停止搅拌并降低温度,然后再进行操作。
The correct use of fully equipped mixer can promote the construction and improve the operation efficiency. Correct use of mechanical parts will damage the equipment and shorten its service life. The main operation is in strict accordance with the instructions. Generally, if the mixer is too hot in summer, the mixing should be stopped immediately and the temperature should be reduced before operation.
1.在操作内置混合器时,液压系统的压力必须符合说明,并且不得随意调节。液压油的质量和数量必须符合原始要求。
1. When operating the built-in mixer, the pressure of the hydraulic system must comply with the instructions and must not be adjusted at will. The quality and quantity of hydraulic oil must meet the original requirements.
2.在运行自动上料搅拌车之前,请注意混合罐中剩余水和碎屑的填充和排放。在运输过程中,需要连续滚动以防止混凝土偏析。在混凝土搅拌车到达施工现场并卸下之前,搅拌机必须以14-18 rpm的全速旋转1-2分钟,然后旋转并卸下。混合罐必须先停止然后打开,然后才能旋转。
2. Before running the automatic feeding mixer, please pay attention to the filling and discharging of the remaining water and debris in the mixing tank. During transportation, continuous rolling is required to prevent concrete segregation. Before the concrete mixer arrives at the construction site and is unloaded, the mixer must rotate at a full speed of 14-18 rpm for 1-2 minutes, and then rotate and unload. The mixing tank must be stopped and then opened before it can be rotated.
3.环境温度不得超过+25摄氏度,从装卸,运输到卸载的连续时间不得超过60分钟,环境温度不得低于+25摄氏度,上述时间不得超过90摄氏度度。分钟。
3. The ambient temperature shall not exceed + 25 ℃, the continuous time from loading, unloading, transportation to unloading shall not exceed 60 minutes, the ambient temperature shall not be lower than + 25 ℃, and the above time shall not exceed 90 ℃. minute.
4.在冬季施工期间,在开始之前检查是否结冰。工作后,小心地搅拌碗和供水系统中残留的水,关闭泵的开关,并将控制手柄置于“停止”位置。
4. During winter construction, check for ice before starting. After work, carefully remove the residual water in the mixing bowl and water supply system, turn off the switch of the pump, and put the control handle in the "stop" position.
5.在施工现场卸货后,有必要使用设备上附带的软管洗净料斗,卸料斗,卸料斜槽等,以去除附着在车身上的污泥和混凝土。在返回搅拌站的途中,应将150-200升水倒入搅拌槽中,以清洁搅拌槽壁和叶片上的混凝土残渣。
5. After unloading at the construction site, it is necessary to use the hose attached to the equipment to clean the hopper, discharge hopper, discharge chute, etc., so as to remove the sludge and concrete attached to the vehicle body. On the way back to the mixing plant, 150-200 liters of water should be poured into the mixing tank to clean the concrete residue on the tank walls and blades.
6.日常操作后,驾驶员将清水倒入自动向前混合器的混合桶中,以高速(14-18 rpm)旋转5-10分钟,然后排干并确认以下各项:需要。感光鼓的内部是干净的。用高压水清洁混合桶的所有部件时,必须小心,避免出现外观和操作杆。压力水喷嘴与车身涂料外部之间的距离必须少为40厘米。
6. After daily operation, the driver will pour clean water into the mixing bucket of automatic forward mixer, rotate it at high speed (14-18 RPM) for 5-10 minutes, then drain and confirm the following items: required. The inside of the drum is clean. When cleaning all parts of the mixing drum with high pressure water, care must be taken to avoid appearance and operating rod. The distance between the pressure water nozzle and the exterior of the body paint must be at least 40 cm.